Jaw crusher remove method and the matters needing attention generalizations

Date:2015-02-09 14:12 From:Bailing Machinery Author:admin
As coarse broken jaw crusher is also the first equipment of broken, for the wear and tear of equipment is the most often, so often should replace worn parts, so we need to remove, so in jaw crusher disassembly process should pay attention to what issues?How to remove the method is correct?We now Bailing will make a simple introduction.

The dismantling of jaw crusher in the process of the first to ensure the disassembly area must be clean and no other impurities, so that we can guarantee the removal of all kinds of spare parts will not be too messy, can easily find and install, also won't appear can't find the phenomenon.

Second in addition to remove the replacement parts, but also for cleaning parts, this can be done at the same time mandibles crusher maintenance work.

Jaw crusher of the right operation method is for connecting rod to remove is the whole crushing machine remove the thrust plate, screw out first baffle bolt, cut off the oil pipe, the thrust plate hanging on the crane or other lifting equipment lifting hook, then loosen the horizontal connecting rod of a spring, pull the moving jaw to the fixed jaw direction, take out the thrust plate.Thrust plate after unloading, cut thin lubricating oil tubing and cooling water pipe, lived in the bottom of the connecting rod with support team, and then unloaded connecting rod cover, can the connecting rod.

Crusher shaft should be removed with pulley and the flywheel.The motor (together with the belt) along the slippery course to crusher closer as far as possible, remove the triangle.Then the crane lift shaft.In order to remove the moving jaw, must cut off the dry oil lubricating oil pipe, remove the tie rod, remove the bearing cover, then moving jaw with a crane or other lifting equipment.